Gold Coast Desalination Plant

From Desal Wiki
Revision as of 22:20, 13 November 2014 by imported>WikiAdmin
Desal Plant Profile - Gold Coast Desalination Plant
Labelled aerial photo of Gold Coast Desalination Plant Labelled aerial photo of Gold Coast Desalination Plant
Total capacity: 133ML/day
Date commissioned: February 2009
Percent of water supply: 27% of South Eastern QLD
feed water temperature (low): 17°C
Feed water temperature (high): 28°C
Seawater intake system: Submerged open sea
Pretreatment system: Ferric sulphate coagulation, sulphuric acid injection (pH reduction), polyDADMAC, dual media pressure filters
RO operating pressure: First pass RO operating pressure - 64 bar (45% recovery). Second pass - 15 bar (85% recovery) [1]
RO passes: 2 [1]
RO trains: 9, 3
Post-treatment system: Lime stabilization, CO2, disinfection by sodium hypochlorite injection
Concentrate disposal: Treated supernatant discharged to sea, solids centrifuged and landfilled
Energy consumption: 3.58 kWh/m3
Energy recovery: Each RO train is fitted with dual-work exchanger energy recovery devices, which recover up to 97% of unused energy from the brine. Renewable energy certificates are being used to fully offset carbon emissions from the plant.
Capital cost: $1200 million
Useful links: http://www.water-technology.net/projects/gold-coast-plant/


Interactive process flow diagram

Error: Invalid title in link at line 3.

Water quality data

Physical & Chemical Properties
Turbidity: 7 NTU
Cations
Anions


References

  1. ↑ 1.0 1.1 Bellizia, G. (2008). GOLD COAST DESALINATION PROJECT. Paper presented at the 33rd Annual Qld Water Industry Operations Workshop, Indoor Sports Centre, Carrara, Gold Coast. http://www.wioa.org.au/conference_papers/08_Qld/documents/GeorgeBellizia_000.pdf Accessed November 6th, 2014

Cite error: <ref> tag with name "billiton" defined in <references> is not used in prior text.
Cite error: <ref> tag with name "crisp" defined in <references> is not used in prior text.