Difference between revisions of "MemEOL"

From Desal Wiki
Line 321: Line 321:
 
<li class="list-group-item">[[membrane testing fact sheet]]</li>
 
<li class="list-group-item">[[membrane testing fact sheet]]</li>
 
</ul>
 
</ul>
 
 
<div class="panel-heading">What is the tested NaCl rejection of your membranes? (% NaCl rejection)</div>
 
<div class="panel-heading">What is the tested NaCl rejection of your membranes? (% NaCl rejection)</div>
 
<div class="panel-body form-horizontal">
 
<div class="panel-body form-horizontal">
Line 334: Line 333:
 
<li class="list-group-item">[[membrane testing fact sheet]]</li>
 
<li class="list-group-item">[[membrane testing fact sheet]]</li>
 
</ul>
 
</ul>
 
 
<!--
 
<!--
 
<div class="panel-heading">How many membranes do you have?</div>
 
<div class="panel-heading">How many membranes do you have?</div>
Line 361: Line 359:
 
->what's a major city?
 
->what's a major city?
 
-->
 
-->
 
 
<div class="panel-heading" alt="Drag and drop the following parameters such that the most important parameter to you is at the top and least important at the bottom.">Please order the following criteria in the order of importance for your project (drag and drop):</div>
 
<div class="panel-heading" alt="Drag and drop the following parameters such that the most important parameter to you is at the top and least important at the bottom.">Please order the following criteria in the order of importance for your project (drag and drop):</div>
 
<div class="panel-body">
 
<div class="panel-body">

Revision as of 01:53, 16 December 2014

Introduction text

Do you suspect there is any physical damage to the membranes that would prevent them from being reused?

What is the tested permeability of your membranes (LMH/bar)?

What is the tested NaCl rejection of your membranes? (% NaCl rejection)

Please order the following criteria in the order of importance for your project (drag and drop):

  • Financial
  • Effort required
  • Environmental impact
  • Landfill impact
  • Public perception
Rank from most important to least important.

Please order the following criteria in the order of importance for your project (drag and drop):

  • Financial
  • Effort required
  • Environmental impact
  • Landfill impact
  • Public perception
Most important Least important